StatsToDo : CUSUM and Shewhart Charts for Normally Distributed Means Explained

Links : Home Index (Subjects) Contact StatsToDo

Related Links:
R Explained Page
CUSUM Charts Explained Page

Introduction Example R Code Example Explained
This page provides explanations and example R codes for CUSUM quality control charts, for detecting changes in mean values where the measurements are normally distributed.

CUSUM Generally

CUSUM is a set of statistical procedures used in quality control. CUSUM stands for Cumulative Sum of Deviations.

In any ongoing process, be it manufacture or delivery of services and products, once the process is established and running, the outcome should be stable and within defined limits near a benchmark. The situation is said to be In Control

When things go wrong, the outcomes depart from the defined benchmark. The situation is then said to be Out of Control

In some cases, things go catastrophically wrong, and the outcomes departure from the benchmark in a dramatic and obvious manner, so that investigation and remedy follows. For example, the gear in an engine may fracture, causing the machine to seize. An example in health care is the employment of an unqualified fraud as a surgeon, followed by sudden and massive increase in mortality and morbidity.

The detection of catastrophic departure from the benchmark is usually by the Shewhart Chart, not covered on this site. Usually, some statistically improbable outcome, such as two consecutive measurements outside 3 Standard Deviations, or 3 consecutive measurements outside 2 Standard Deviations, is used to trigger an alarm that all is not well.

In many instances however, the departures from outcome benchmark are gradual and small in scale, and these are difficult to detect. Examples of this are changes in size and shape of products caused by progressive wearing out of machinery parts, reduced success rates over time when experienced staff are gradually replaced by novices in a work team, increases in client complaints to a service department following a loss of adequate supervision.

CUSUM is a statistical process of sampling outcome, and summing departures from benchmarks. When the situation is in control, the departures caused by random variations cancel each other numerically. In the out of control situation, departures from benchmark tend to be unidirectional, so that the sum of departures accumulates until it becomes statistically identifiable.

The mathematical process for CUSUM is in 2 parts. The common part is the summation of depertures from the bench mark (CUSUM, and graphically demonstrating it. The unique part is the calculation of the decision interval abbreviated as DI or h, and the reference value, abbreviated as k, which continuously adjustes the CUSUM and itd variance. The two values of h and k depends on the following parameters

  • The in control values
  • The out of control values
  • The Type I Error or false positive rate, expressed as the Average Run Length, abbreviated as ARL, the number of samples expected for a false positve decision when the situation is in control. ARL is the inverse of false positive rate. A false positive rate of 1% would have ARL=100

CUSUM for Normally Distributed Mean

This is a very common quality control method, and assumes that the measurement involved is a continuous measurement that is normally distributed. Examples are diameters of ball bearings produced by a machine, weight of food packages coming off the assembly line. In health care, continuous monitoring of puls rate and temperature in a patient under intensive care.

The parameters required are

  • The mean and Standard Deviation of the measurement when the situation is in control. The Standard Deviation is based on each single measurement. In some situations monitoring uses means of a number of measurements instead of single measurements, and in this case the Stndard Deviation is the Standard Error of mean, SE = SD/sqrt(n), where n is the number of measurements per sample
  • The mean of the measurement when out of control. This is not so much the expected value, but the departure that is big enough to warrant investigation and intervention
  • The Average Run Length (ARL). This depends on a balance between the importance of detecting deviation against the cost of disruption in case of a false positive. Please note: that the algorithm on this page is intended for a one tail monitoring, either an increase or a decrease in the value. If the user intends a two tail monitoring, to detect either increase of decrease, the two CUSUM charts should be created, each with half the ARL that of a one tail CUSUM.

Details of how the analysis is done and the results are describer in the panel R Code Explained

References

CUSUM : Hawkins DM, Olwell DH (1997) Cumulative sum charts and charting for quality improvement. Springer-Verlag New York. ISBN 0-387-98365-1 p 47-74, 141-142

Hawkins DM (1992) Evaluation of average run lengths of cumulative sum charts for an arbitrary data distribution. Journal Communications in Statistics - Simulation and Computation Volume 21, - Issue 4 Pages 1001-1020

https://cran.r-project.org/web/packages/CUSUMdesign/index.html

https://cran.r-project.org/web/packages/CUSUMdesign/CUSUMdesign.pdf